Case Study - Delayed Coking Switching
For years, a delayed coking unit in a heavy oils processing plant in mid-west US accepted as ‘normal’ from their existing switch valve OEM the issues in their switching operation, including
• sticking valve
• coking up valve body
• excessive steam usage
• undependable deliveries
• lack of service support
The MOGAS DV-4 switching valve offered the solutions to all the unit's challenges.
Modified Date: 05/29/2020